Trenchless Australia – March 2015 – Atteris’s efforts in QLD river flooding
Following the recent flooding of the south east Queensland’s Kolan River, contractors and equipment suppliers worked together seamlessly to replace a key section of a 16-year-old gas pipeline, pulling off a minimally intrusive horizontal directional drilling operation at a site surrounded by layers of cobble. Atteris where engaged as APA Group’s engineering consultant to review the geotechnical data and proposed design using an intersect drilling method.