Trenchless Australia – March 2015 – Atteris’s efforts in QLD river flooding

Following the recent flooding of the south east Queensland’s Kolan River, contractors and equipment suppliers worked together seamlessly to replace a key section of a 16-year-old gas pipeline, pulling off a minimally intrusive horizontal directional drilling operation at a site surrounded by layers of cobble. Atteris where engaged as APA Group’s engineering consultant to review the geotechnical data and proposed design using an intersect drilling method.

Click to Download

Click to Download