Engineering Innovation – Wheatstone Project

Atteris’ concept design of a 1.2 km microtunnel for the shore crossing of Chevron Wheatstone’s 225 km 44-inch trunkline has been recognised as an innovative solution; overcoming difficult geotechnical conditions, minimising environmental impact, and ticking the box of a number of Chevron’s key  commitments.

Called the “critical link”, Atteris completed the concept and front-end engineering design of the tunnel, and provided engineering support throughout the execution phase. In addition to the shore crossing, Atteris were also engaged for engineering services on the offshore trunkline, flowline, and platform facilities throughout all project phases.